Saturday, September 13, 2008

So last we wrote

I had a valve train problem, which the solution took some money. My first work study check will be sent out on the 25th and i have well over 20 hours at 6.55 in addition to a 20 dollur tip from doing a brake job for the welding instructors and 29 from scrap metal. hopfully it will be close to the 186.95 I need for the first installment of parts for my valve train.

If all goes well next weeks pay peroid I'll order my second order which will consist of roller rocker arms and mounting studs.(very nearly 200 on the second order as well)

After that ill Have an anally excessive number of assembly pictures and maybe some Videos Which will be embedded here for your veiwing pleasure. One that you will absolutly get is the start-up and break in of the engine, thats a given.

No comments: